The plant hot water project needs to solve the following problems:
1, the factory staff dormitory water, or factory production water, to meet the water consumption and temperature;
2, to consider the water requirements, water quality requirements, water time, etc.;
3, to meet the actual needs of the factory and the convenience of use, energy-saving effect;
4, as far as possible to reduce installation costs, use costs and maintenance costs.
5. Air energy hot water project takes into account environmental protection, safety and other factors.
The basic parameters required for the design of the hot water project in the factory:
1, where need to use hot water, specific requirements? How many dormitories are there and how many employees live in each?
Is hot water used in production? What is the water consumption and temperature required?
2, is the unified water supply, or separate water supply, regular water supply or metering water?
3, staff water: bucket (20-30Kg per person per day), shower (40-60Kg per person per day)
4. Number of dormitory floors. Where is the hot water pipe connected? A shower room? The balcony? The hallway? Please provide piping drawings
5, how to manage: timing (time segment) water supply? Ration water supply (water meter or IC card water meter)
6, there is no heat recovery possibility (air compressor, generator, injection molding machine, steam tail steam, etc.)
7. Equipment installation site (length, width, orientation, and surrounding buildings), please provide drawings